Join fellow consulting engineers, industry leaders, clients, and stakeholders for three days of networking, professional development, and conversations shaping the future of New Jersey’s engineering profession. From AI and data center infrastructure to transportation, nuclear energy, emerging technologies, workforce development, and more, the conference offers valuable opportunities to learn, connect, and share ideas.

Tuesday September 15, 2026 10:15am - 11:15am EDT
This presentation details the evolution of the Irving Street Bridge replacement project in downtown Rahway, New Jersey. The bridge, a three-barrel stone and brick arch structure built circa 1875, is one of only two remaining stone-arch bridges in Union County and is considered a historically eligible structure. The project began in 2016 as a replacement for the structurally deficient bridge. However, the New Jersey Historic Preservation Office preferred a rehabilitation approach to preserve its historical character, leading to a new goal of building a "bridge within a
bridge". This plan was ultimately disrupted in 2021 when Hurricane Ida caused significant damage, including the collapse of the downstream parapet. The damage revealed that the spandrel walls were filled with large stone and debris, making rehabilitation no longer a viable option. Consequently, the project reverted to a full replacement, with a design that honors the bridge's original aesthetic while meeting modern standards. The new structure is a two-span bridge featuring precast concrete arches, cast-in-place foundations and an ashlar stone façade to maintain
its historic appearance. The parapet was designed to match the original shape while complying with current MASH safety standards. The presentation outlines the construction phase, which involves navigating tight site conditions and numerous utilities. The project, with a bid cost of $3,364,870.00, is scheduled for completion in October 2026.

Learning Objectives:
Following the presentation, participants will be able to describe the evolution of a historically significant bridge replacement project, including how unforeseen events like Hurricane Ida necessitated a complete change in design from rehabilitation to reconstruction. They will also gain insight into the specific engineering solutions, historical coordination, and construction management strategies used to execute this complex project in a dense urban environment.

Audience:
The session is intended for professionals in civil engineering, public works, construction management, and project management, particularly those who work on public infrastructure projects involving historical structures. It addresses the complex, multi-faceted challenge of replacing aging, historically significant infrastructure in a dense urban environment. It specifically details how to manage a project that is radically altered by a catastrophic recent event (a hurricane), forcing a shift from a planned rehabilitation to a full replacement. The presentation is a case study from the perspective of RVE, the firm that designed and managed the replacement. It showcases their process, challenges, and
solutions. The session covers the entire project lifecycle, including initial design, regulatory and historical approvals, crisis response and redesign after Hurricane Ida, and construction management and coordination. The presentation is heavily influenced by the damage caused by Hurricane Ida in 2021, which was the pivotal event that made the original plan to rehabilitate the bridge impossible and required a complete redesign.


Speakers
avatar for James Boegly

James Boegly

Remington & Vernick Engineers
James Boegly, PE, has more than 10 years of experience in the construction industry performing office engineering, construction management/inspection and resident engineering tasks. His responsibilities include construction documentation; inspection; cost estimating; schedule analysis... Read More →
avatar for Joseph Ragusa

Joseph Ragusa

Remington & Vernick Engineers
Joseph R. Ragusa, Jr., PE, has more than 15 years of construction management experience specializing in inspection, grant administration, traffic coordination and cost/schedule management for heavy civil construction, particularly highways and bridges. He serves as Project Manager... Read More →
avatar for Dustin Schopen

Dustin Schopen

Remington & Vernick Engineers
Dustin M. Schopen, PE, has more than 15 years of bridge engineering experience in new design and rehabilitation of existing structures. His expertise encompasses steel design and detailing, structural analysis, load rating and comprehensive project management from concept through... Read More →
avatar for Frank Seney

Frank Seney

Remington & Vernick Engineers
Frank J. Seney, Jr., PE, has more than 40 years of engineering and project management experience specializing in bridges, highways, stormwater systems and infrastructure improvements. He provides senior leadership across all project phases including design, planning, inspection... Read More →
Tuesday September 15, 2026 10:15am - 11:15am EDT
Golden Nugget: Biscayne A 600 Huron Ave, Atlantic City, NJ 08401

Attendees (1)


Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!

Share Modal

Share this link via

Or copy link